My client is responsible for the production of "early power" on a new power plant project which is undergoing construction in Oman. Due to this, they require numerous operators with significant experience of GT26 Gas Turbines to undertake commissioning and early operation of the facility whilst construction continues on site.
This is initially 12 month assignment with the possibility to extend beyond this period.
min requirements:
> 5 years minimum experience operating GT 26 Turbines
> 10 years minimum experience in operation of Power Plants
> Relevant qualification
---
Roles will be offered on a 1 year contract (possible extension)
Roles are offered on a single status basis
Accommodation will be provided
Send resume to soor@jobs-n-jobs.com or soormaaz279@gmail.com
Comments